What to check before accepting a living green wall
The handover is an opportunity to watch water travel through the installed wall and to see how a gardener will reach a failed module. Arrange the demonstration while the installer is still on site.
What to do
- Ask the installer to run an irrigation cycle. Observe the upper and lower planting pockets, the collection point and the surrounding floor. Record the normal operating settings they recommend.
- Ask a member of the maintenance team to identify the shut-off, show how a module can be reached and explain who will respond to a leak after office hours.
What to avoid
- Avoid signing off solely from a front-facing photograph. A wall can look full while the upper modules are difficult to reach for replacement.
- Keep patchy growth and leaks as separate issues in the handover record. A dry section, a shaded section and water reaching the floor need different follow-up.
A practical check
Photograph the wall in labelled sections at handover. Take the next set from the same positions so facilities staff can identify where a change started.