How to protect a garden tree during a Singapore home renovation

A tree can lose roots while its trunk and crown still look untouched. Before a paving crew arrives, put the delivery route, temporary storage and proposed excavation on the same drawing as the tree you want to retain.

What to do

  1. Bring an arborist into the planning walk before the paving layout or trench route is fixed. Show where existing soil levels will change. Ask the arborist to mark the protection boundary for this tree and put it on the contractor's drawing.
  2. Walk the route from the gate with the site supervisor. Mark where pallets will be unloaded, where the skip will stand and how workers will reach the back garden. Repeated traffic and stacked materials can compact the soil around roots even when excavation is elsewhere.
  3. Have the agreed barrier installed before the first delivery. Put the site contact on it so a driver or subcontractor can ask where to put a load. Photograph the barrier and surrounding ground before work begins.
  4. If a new drain, cable or footing conflicts with the protected area, ask the supervisor to hold that part of the work for arborist review. A route change on paper is easier than dealing with roots already severed. Record any agreed change on the site copy of the plan.

What to avoid

A practical check

Suppose a patio fits outside the marked boundary but the shortest wheelbarrow route crosses it. Agree on another route and show it on the delivery sketch before accepting the quotation. At handover, give the arborist the before-and-after photos and details of any changes so follow-up care reflects what happened on site.

International Society of Arboriculture guide to protecting trees during construction (PDF). For local approval questions, see Singapore tree-work rules.