Why did our Hunter X-Core skip watering on the 31st?
On a Hunter X-Core set to Odd watering days, the 31st of every month is an off day. The same exception applies to 29 February in a leap year. A planter that receives water on 29 January and again on 1 February can therefore have a three-day gap even when the controller is working as programmed.
What to do
- Check the model, current date, selected programme and Water Days setting. Photograph them before changing anything. A note saying 'alternate days' on an estate handover sheet could refer to odd calendar dates, even calendar dates or a repeating two-day interval. Those schedules do not always produce the same visits.
- Write the expected dates across a month boundary. With Odd selected, the January sequence ends on the 29th and resumes on 1 February. A repeating two-day interval starting on 29 January would instead include 31 January and 2 February, assuming no other watering-day exclusions. Confirm which sequence the planting plan calls for.
- Check moisture in the affected planter and record what happens at the next expected automatic start. If the site needs a fixed interval, have the person responsible for irrigation update the programme, check for excluded days and return the dial to Run. Put the next three expected watering dates in the handover.
What to avoid
- Adding a second start time to make up for the 31st. Start times on this controller repeat a programme on its eligible watering days. An extra start can double a later watering round while leaving the original date gap in place.
- Assuming the date setting explains a single dry pot when the rest of the same station watered. In that case, check the individual outlet and compare its delivery with a neighbouring one.
A practical check
Suppose a caretaker finds a sheltered trough dry on 31 January. The X-Core shows the correct date and Odd for that trough's programme. Record the expected skip, assess whether the trough needs hand watering that day and check delivery on 1 February. That gives the supervisor evidence for deciding whether the calendar schedule suits this planting.
See Hunter guidance on odd and even watering dates and interval watering in the X-Core manual (PDF). For repeated cycles, see how programme start times work.
LeaforaGet in touch